Complete demolition of two bathrooms and a wet bar at the same time, both bathrooms had some major layout revisions including moving walls and reworking plumbing in the floor system and in the basement concrete. Roughed in new electrical, HVAC and Plumbing. Installed new cabinets, countertops, LVP Flooring, new lighting and plumbing fixtures along with new appliances in the wet bar.